Steel Framing Process
your plans to a framed building—a coordinated, step-by-step process.
step 1
Plan Intake
Submit your plans and project scope. We review for framing feasibility and identify coordination items early.
step 2
Engineering & Modeling
We build a 3D model of your framing system, run clash detection, and resolve conflicts before fabrication begins.
step 3
Shop Drawings
You receive a complete, stamped shop drawing package for review and approval.
step 4
Fabrication
Panels, trusses, and components are manufactured in our facility to engineered tolerances.
step 5
Bundling & Sequencing
Assemblies are bundled, labeled, and organized in installation order for your jobsite.
step 6
Just-in-Time Delivery
We deliver to your schedule—no excess material staging, no congestion.
step 7
Field Support
Our team is available to support install questions, field conditions, and coordination with follow-on trades.
KEY ADVANTAGES
of LGS framing
Speed
Commonly supports 30%+ faster build timelines and substantially faster framing installation.
Accuracy
Factory precision, exact openings, and stable framing improve fit, finish, and downstream coordination.
Labor Efficiency
Pre-assembled panels and complex geometry reduce dependence on specialized field crews.
Durability
Noncombustible, mold resistant, rot resistant, termite resistant, and dimensionally stable.
Sustainability
Steel is recyclable and typically generates far less waste than conventional stick-built methods.
Logistics
Just-in-time delivery reduces site clutter, staging issues, and unnecessary material handling.